Donate using PayPal

Photo listing : cycleways (problem)

The most recent photos are listed first. See also photomap view.

This listing only shows photos within Aberystwyth.
Go to the national CycleStreets photo listings for photos beyond.

The cycle route from Aberystwyth to Trawscoed crosses the A487 at Llanfarian. There is an urgent need for a safe crossing point, especially for children. There can be a heavy density of traffic in both directions with limited visibility of ... [more]

Cycle hangars so people living in flats can store their bikes safely and out of the weather. It only takes 1 car parking space to store 6 bikes

Remove one of the lanes of traffic and create segregated cycleways on both sides of the carriageway.

There should be cycleways along both sides of Park Avenue.

This junction should be traffic-light controlled and there should be cycleways on Waunfawr Road, the B4572 and on both sides of Penglais Hill. Cycleways and pedestrians should have priority at the junction.

The A487 is wide enough here to support the creation of a cyclepath to allow residents of the extended communities of Bow Street, Penygarn, Rhydypennau and Llandre to access the new Bow Street station (as well as existing village services) ... [more]

Fast trunk road with bends without clear line of sight and no pavement or cyclepath. Improvements here, or an alternative Active Travel route between Tal-y-bont and Taliesin will allow more people to move between the two communities without ... [more]

Steep hill into and out of Tal-y-bont without a pavement or cyclepath. There is a cyclepath at the exit of the village but for travelling north users have to cross the trunk road at a location where southbound vehicles are accelerating out ... [more]

This is the direct route from Aberystwyth and the new Bow Street railway station to the outlying villages of Tal-y-bont, Ta;iesin and Tre'r Ddol. There is a shared use path that extends alongside the A487 from the outskirts of Tal-y-bont bu ... [more]

Very busy bit of the road, lots of cyclists using the pavement as visibility is poor, would link Aberystwyth, Penparcau and Trefechan and enable a safe route to the nearby school and in to work for the majority of the population of the Aber ... [more]

Cyclists coming down Aberystwyth Road should be allowed to continue down Pendre to access the town centre, without having to go around the one way system

A segregated cycleway along Gwbert Road would allow the residents of Ferwig Road, Cwnc y Dintir, Maesglas etc to cycle to town

Improved, segregated cycleway could connect town centre to Parc Teifi

A cycleway along Aberystwyth Road would connect Tesco, the secondary school and the town centre. Safe crossing points would enable people to cycle from north park to the primary school along Napier Street

Cycleway needed to link Penparcau and cycle trail in Rhydyfelin

The main route from Penparcau all the way into Aberystwyth. There isn't a route, so lots of people are going on the pavement. This is a gentle slope into Aberystwyth and goes via Trefchan too

Remove give way lines from cycle lane

Cycle lanes needed here

Remove parking and allow contraflow cycling

Connect the cycle lane to the centre of town properly

Take away a lane of traffic along this entire road make it one way and put in a cycleway and a wider pavement

Take away a lane of traffic and put a Cycleway there. None of this shared space nonsense

Great to see new @WG_Economy funded #activetravel schemes in #aberystwyth @CeredigionCC https://t.co/faLRnRIcbW [The replies to this tweet do not appear to share the opinion that this is in any way 'great'.]

Useful cut-through to Sainsbury's in Lampeter - a dropped kerb would help.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://aberystwyth.cyclestreets.net/photos/cycleways/bad/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.